Estimated from distance; confirm at the station. Exit within 3 hr of entering. Rapid Metro Line: Fare is an estimate; confirm with the operator.
⇄ Return: Phase 2 to Krishna Park ExtensionYour journey
Show all 11 stationsHide all 11 stations
Show all 8 stationsHide all 8 stations
First & last metro
| Station | First | Last |
|---|---|---|
| Magenta Line Krishna Park Extension Towards Botanical Garden | 5:50 AM | 11:00 PM |
| Yellow Line Hauz Khas Towards Millennium City Centre Gurugram | 6:20 AM | 11:50 PM |
| Rapid Metro Line Sikandarpur Towards Phase 3 | 5:41 AM | 11:11 PM |
Times are approximate and can differ on Sundays and holidays. Check the operator for exact timings.
Route map
Metro map

Open full size · Scroll or pinch to zoom, drag to move
Book Metro Tickets Online For Krishna Park Extension to Phase 2
Book DMRC QR Ticket OnlineHow to reach Phase 2 from Krishna Park Extension by metro?
Board the metro at Krishna Park Extension station on the line towards Botanical Garden and travel through 21 intermediate metro stations. This route needs 2 train changes (2 interchanges at Hauz Khas, Sikandarpur); switch trains there to continue to Phase 2.
The approximate travel time between Krishna Park Extension and Phase 2 is 0 hrs 57 mins. The total distance covered on this metro route is 32.6 Km. The first metro from Krishna Park Extension departs at 5:50 AM, while the last train leaves at 11:00 PM.
The estimated metro fare for this route is ₹64. Smart card users may receive discounted fares.
Peak Hour Details
Mon-Fri: 8:00 AM – 12:00 PM and 5:00 PM – 9:00 PMMetro vs cab, auto and bike: fare and time
Estimates for about 37.5 km
| Mode | Est. fare | Est. time |
|---|---|---|
Metro32.6 kmCheapestFastest | ₹64 | 57 min |
Cab / Taxi37.5 km | ₹545–690 | 1 hr 34 min |
Auto-rickshaw37.5 km | ₹440–560 | 1 hr 52 min |
Bike taxi37.5 km | ₹240–305 | 1 hr 20 min |
💡 Compared with a cab / taxi, the metro saves about ₹554 on this trip.
Road fares are estimates based on typical rates and change with traffic, time of day and app surge pricing. Metro fares follow the fare chart on this site.
FAQs
What is the metro fare from Krishna Park Extension to Phase 2?
The Delhi Metro fare from Krishna Park Extension to Phase 2 is ₹64. Fares are determined by DMRC based on the distance traveled and may be updated from time to time.
How long does it take to travel from Krishna Park Extension to Phase 2 by metro?
The metro journey from Krishna Park Extension to Phase 2 takes approximately 57 min. Including station entry, security checks, and walking inside stations, allow around 1 hr 12 min for the complete trip.
How many stations are there between Krishna Park Extension and Phase 2?
There are 22 stations between Krishna Park Extension and Phase 2 on this route, including any interchange stations if a line change is required.
Do I need to change metro lines to travel from Krishna Park Extension to Phase 2?
This route requires 2 interchange(s). 2 interchanges at Hauz Khas, Sikandarpur
Where do I need to change metro lines between Krishna Park Extension and Phase 2?
If a line change is required, passengers should interchange via Hauz Khas, Sikandarpur. Follow the signs inside the station to reach the correct platform for the next leg of the journey.
Which metro lines are used on the route from Krishna Park Extension to Phase 2?
The recommended route from Krishna Park Extension to Phase 2 uses the following Delhi Metro line(s): Magenta, Yellow, Rapid Metro.
What is the distance between Krishna Park Extension and Phase 2?
The metro distance between Krishna Park Extension and Phase 2 is approximately 32.6 km.
Which direction should I take from Krishna Park Extension station?
When starting your journey at Krishna Park Extension, board the train heading towards Botanical Garden. Platform signage at the station can help confirm the correct direction before boarding.
What is the Sunday metro fare from Krishna Park Extension to Phase 2?
The Delhi Metro fare from Krishna Park Extension to Phase 2 on Sunday is ₹54. Fare discounts, where applicable, are reflected in the displayed amount.
What is the fastest metro route from Krishna Park Extension to Phase 2?
The recommended metro route from Krishna Park Extension to Phase 2 takes around 57 min and includes 2 interchange(s). It is designed to provide an efficient journey across the Delhi Metro network.
