Phase 1 to Krishna Park Extension Metro Route

Fare, time, interchanges and route map.

Operator: Delhi Metro Rail Corporation (DMRC)Official website ↗Helpline: 155370
Rs 64Mon–Sat fare
Rs 54Sun & holidays
57 minTime
32.6 kmDistance
22Stops
2Changes

Estimated from distance; confirm at the station. Exit within 3 hr of entering. Rapid Metro Line: Fare is an estimate; confirm with the operator.

⇄ Return: Krishna Park Extension to Phase 1
WhatsApp

Your journey

Reach destination by --:--
Rapid Metro LineTowards Phase 3
--:--Phase 12 min · 1 stop--:--Sikandarpur
🔁 Change at Sikandarpur: Rapid Metro Line → Yellow Line · ~6 min
Yellow LineTowards Samaypur Badli
--:--Sikandarpur19 min · 9 stops--:--Hauz Khas
Show all 8 stationsHide all 8 stations
🔁 Change at Hauz Khas: Yellow Line → Magenta Line · ~5 min
Magenta LineTowards Krishna Park Extension
--:--Hauz Khas25 min · 12 stops--:--Krishna Park Extension
Show all 11 stationsHide all 11 stations

First & last metro

StationFirstLast
Rapid Metro Line Phase 1
Towards Phase 3
5:38 AM11:08 PM
Yellow Line Sikandarpur
Towards Samaypur Badli
5:36 AM11:06 PM
Magenta Line Hauz Khas
Towards Krishna Park Extension
6:17 AM11:27 PM

Times are approximate and can differ on Sundays and holidays. Check the operator for exact timings.

Route map

Phase 1StartSikandarpurChange to Yellow LineGuru DronacharyaArjan GarhGhitorniSultanpurChhattarpurQutab MinarSaketMalviya NagarHauz KhasChange to Magenta LineIIT DelhiRK PuramMunirkaVasant ViharShankar ViharTerminal 1 IGI AirportSadar Bazaar CanttPalamDashrath PuriDabri MorJanakpuri WestKrishna Park ExtensionDestination

Metro map

Delhi Metro Route Map

Open full size · Scroll or pinch to zoom, drag to move

Book Metro Tickets Online For Phase 1 to Krishna Park Extension

Book DMRC QR Ticket Online

How to reach Krishna Park Extension from Phase 1 by metro?

Board the metro at Phase 1 station on the line towards Phase 3 and travel through 21 intermediate metro stations. This route needs 2 train changes (2 interchanges at Sikandarpur, Hauz Khas); switch trains there to continue to Krishna Park Extension.

The approximate travel time between Phase 1 and Krishna Park Extension is 0 hrs 57 mins. The total distance covered on this metro route is 32.6 Km. The first metro from Phase 1 departs at 5:38 AM, while the last train leaves at 11:08 PM.

The estimated metro fare for this route is ₹64. Smart card users may receive discounted fares.

Peak Hour Details

Mon-Fri: 8:00 AM – 12:00 PM and 5:00 PM – 9:00 PM

Metro vs cab, auto and bike: fare and time

Estimates for about 37.5 km

ModeEst. fareEst. time
Metro32.6 kmCheapestFastest
₹6457 min
Cab / Taxi37.5 km
₹545–6901 hr 34 min
Auto-rickshaw37.5 km
₹440–5601 hr 52 min
Bike taxi37.5 km
₹240–3051 hr 20 min

💡 Compared with a cab / taxi, the metro saves about ₹554 on this trip.

Road fares are estimates based on typical rates and change with traffic, time of day and app surge pricing. Metro fares follow the fare chart on this site.

FAQs

What is the metro fare from Phase 1 to Krishna Park Extension?

The Delhi Metro fare from Phase 1 to Krishna Park Extension is ₹64. Fares are determined by DMRC based on the distance traveled and may be updated from time to time.

How long does it take to travel from Phase 1 to Krishna Park Extension by metro?

The metro journey from Phase 1 to Krishna Park Extension takes approximately 57 min. Including station entry, security checks, and walking inside stations, allow around 1 hr 12 min for the complete trip.

How many stations are there between Phase 1 and Krishna Park Extension?

There are 22 stations between Phase 1 and Krishna Park Extension on this route, including any interchange stations if a line change is required.

Do I need to change metro lines to travel from Phase 1 to Krishna Park Extension?

This route requires 2 interchange(s). 2 interchanges at Sikandarpur, Hauz Khas

Where do I need to change metro lines between Phase 1 and Krishna Park Extension?

If a line change is required, passengers should interchange via Sikandarpur, Hauz Khas. Follow the signs inside the station to reach the correct platform for the next leg of the journey.

Which metro lines are used on the route from Phase 1 to Krishna Park Extension?

The recommended route from Phase 1 to Krishna Park Extension uses the following Delhi Metro line(s): Rapid Metro, Yellow, Magenta.

What is the distance between Phase 1 and Krishna Park Extension?

The metro distance between Phase 1 and Krishna Park Extension is approximately 32.6 km.

Which direction should I take from Phase 1 station?

When starting your journey at Phase 1, board the train heading towards Phase 3. Platform signage at the station can help confirm the correct direction before boarding.

What is the Sunday metro fare from Phase 1 to Krishna Park Extension?

The Delhi Metro fare from Phase 1 to Krishna Park Extension on Sunday is ₹54. Fare discounts, where applicable, are reflected in the displayed amount.

What is the fastest metro route from Phase 1 to Krishna Park Extension?

The recommended metro route from Phase 1 to Krishna Park Extension takes around 57 min and includes 2 interchange(s). It is designed to provide an efficient journey across the Delhi Metro network.

More routes from Phase 1

Related guides