Estimated from distance; confirm at the station. Exit within 3 hr of entering. Rapid Metro Line: Fare is an estimate; confirm with the operator.
⇄ Return: Mundka Industrial Area to Phase 1Your journey
Show all 11 stationsHide all 11 stations
Show all 9 stationsHide all 9 stations
Show all 11 stationsHide all 11 stations
First & last metro
| Station | First | Last |
|---|---|---|
| Rapid Metro Line Phase 1 Towards Phase 3 | 5:38 AM | 11:08 PM |
| Yellow Line Sikandarpur Towards Samaypur Badli | 5:36 AM | 11:06 PM |
| Pink Line Dilli Haat INA Towards Majlis Park | 6:55 AM | 11:55 PM |
| Green Line Punjabi Bagh West Towards Brigadier Hoshiyar Singh | 6:04 AM | 11:04 PM |
Times are approximate and can differ on Sundays and holidays. Check the operator for exact timings.
Route map
Metro map

Open full size · Scroll or pinch to zoom, drag to move
Book Metro Tickets Online For Phase 1 to Mundka Industrial Area
Book DMRC QR Ticket OnlineSummary
To travel from Phase 1 to Mundka Industrial Area by Delhi Metro, board the train at Phase 1 metro station towards Phase 3 and ride through 34 intermediate stations. This route needs 3 train changes (3 interchanges at Sikandarpur, Dilli Haat INA, Punjabi Bagh West); switch trains there to continue to Mundka Industrial Area.
The metro travel time from Phase 1 to Mundka Industrial Area is approximately 1 hrs 32 mins, and the total distance covered on this route is 49.4 km. The first metro from Phase 1 departs at 5:38 AM, while the last train leaves at 11:08 PM.
The estimated metro fare from Phase 1 to Mundka Industrial Area is ₹64. Smart card users may receive discounted fares.
Peak Hour Details
Mon-Fri: 8:00 AM – 12:00 PM and 5:00 PM – 9:00 PMMetro vs cab, auto and bike: fare and time
Estimates for about 56.8 km
| Mode | Est. fare | Est. time |
|---|---|---|
Metro49.4 kmCheapestFastest | ₹64 | 1 hr 32 min |
Cab / Taxi56.8 km | ₹815–1040 | 2 hr 22 min |
Auto-rickshaw56.8 km | ₹660–840 | 2 hr 50 min |
Bike taxi56.8 km | ₹360–460 | 2 hr 2 min |
💡 Compared with a cab / taxi, the metro saves about ₹863 on this trip.
Road fares are estimates based on typical rates and change with traffic, time of day and app surge pricing. Metro fares follow the fare chart on this site.
More routes from Phase 1
FAQs
What is the metro fare from Phase 1 to Mundka Industrial Area?
The Delhi Metro fare from Phase 1 to Mundka Industrial Area is ₹64. Fares are determined by DMRC based on the distance traveled and may be updated from time to time.
How long does it take to travel from Phase 1 to Mundka Industrial Area by metro?
The metro journey from Phase 1 to Mundka Industrial Area takes approximately 1 hr 32 min. Including station entry, security checks, and walking inside stations, allow around 1 hr 42 min for the complete trip.
How many stations are there between Phase 1 and Mundka Industrial Area?
There are 35 stations between Phase 1 and Mundka Industrial Area on this route, including any interchange stations if a line change is required.
Do I need to change metro lines to travel from Phase 1 to Mundka Industrial Area?
This route requires 3 interchange(s). 3 interchanges at Sikandarpur, Dilli Haat INA, Punjabi Bagh West
Which metro lines are used on the route from Phase 1 to Mundka Industrial Area?
The recommended route from Phase 1 to Mundka Industrial Area uses the following Delhi Metro line(s): Rapid Metro, Yellow, Pink, Green.
What is the distance between Phase 1 and Mundka Industrial Area?
The metro distance between Phase 1 and Mundka Industrial Area is approximately 49.4 km.
Which direction should I take from Phase 1 station?
When starting your journey at Phase 1, board the train heading towards Phase 3. Platform signage at the station can help confirm the correct direction before boarding.
What is the Sunday metro fare from Phase 1 to Mundka Industrial Area?
The Delhi Metro fare from Phase 1 to Mundka Industrial Area on Sunday is ₹54. Fare discounts, where applicable, are reflected in the displayed amount.
What is the fastest metro route from Phase 1 to Mundka Industrial Area?
The recommended metro route from Phase 1 to Mundka Industrial Area takes around 1 hr 32 min and includes 3 interchange(s). It is designed to provide an efficient journey across the Delhi Metro network.


