Estimated from distance; confirm at the station. Exit within 3 hr of entering. Rapid Metro Line: Fare is an estimate; confirm with the operator.
⇄ Return: IP Extension to Sector 42-43Your journey
Show all 1 stationsHide all 1 stations
Show all 11 stationsHide all 11 stations
Show all 10 stationsHide all 10 stations
First & last metro
| Station | First | Last |
|---|---|---|
| Rapid Metro Line Sector 42-43 Towards Phase 3 | 5:36 AM | 11:06 PM |
| Yellow Line Sikandarpur Towards Samaypur Badli | 5:36 AM | 11:06 PM |
| Pink Line Dilli Haat INA Towards Burari | 6:32 AM | 11:32 PM |
Times are approximate and can differ on Sundays and holidays. Check the operator for exact timings.
Route map
Metro map

Open full size · Scroll or pinch to zoom, drag to move
Book Metro Tickets Online For Sector 42-43 to IP Extension
Book DMRC QR Ticket OnlineHow to reach IP Extension from Sector 42-43 by metro?
Board the metro at Sector 42-43 station on the line towards Phase 3 and travel through 24 intermediate metro stations. This route needs 2 train changes (2 interchanges at Sikandarpur, Dilli Haat INA); switch trains there to continue to IP Extension.
The approximate travel time between Sector 42-43 and IP Extension is 1 hrs 6 mins. The total distance covered on this metro route is 36.2 Km. The first metro from Sector 42-43 departs at 5:36 AM, while the last train leaves at 11:06 PM.
The estimated metro fare for this route is ₹64. Smart card users may receive discounted fares.
Peak Hour Details
Mon-Fri: 8:00 AM – 12:00 PM and 5:00 PM – 9:00 PMMetro vs cab, auto and bike: fare and time
Estimates for about 41.6 km
| Mode | Est. fare | Est. time |
|---|---|---|
Metro36.2 kmCheapestFastest | ₹64 | 1 hr 6 min |
Cab / Taxi41.6 km | ₹600–765 | 1 hr 44 min |
Auto-rickshaw41.6 km | ₹485–620 | 2 hr 5 min |
Bike taxi41.6 km | ₹265–340 | 1 hr 29 min |
💡 Compared with a cab / taxi, the metro saves about ₹620 on this trip.
Road fares are estimates based on typical rates and change with traffic, time of day and app surge pricing. Metro fares follow the fare chart on this site.
FAQs
What is the metro fare from Sector 42-43 to IP Extension?
The Delhi Metro fare from Sector 42-43 to IP Extension is ₹64. Fares are determined by DMRC based on the distance traveled and may be updated from time to time.
How long does it take to travel from Sector 42-43 to IP Extension by metro?
The metro journey from Sector 42-43 to IP Extension takes approximately 1 hr 6 min. Including station entry, security checks, and walking inside stations, allow around 1 hr 21 min for the complete trip.
How many stations are there between Sector 42-43 and IP Extension?
There are 25 stations between Sector 42-43 and IP Extension on this route, including any interchange stations if a line change is required.
Do I need to change metro lines to travel from Sector 42-43 to IP Extension?
This route requires 2 interchange(s). 2 interchanges at Sikandarpur, Dilli Haat INA
Where do I need to change metro lines between Sector 42-43 and IP Extension?
If a line change is required, passengers should interchange via Sikandarpur, Dilli Haat INA. Follow the signs inside the station to reach the correct platform for the next leg of the journey.
Which metro lines are used on the route from Sector 42-43 to IP Extension?
The recommended route from Sector 42-43 to IP Extension uses the following Delhi Metro line(s): Rapid Metro, Yellow, Pink.
What is the distance between Sector 42-43 and IP Extension?
The metro distance between Sector 42-43 and IP Extension is approximately 36.2 km.
Which direction should I take from Sector 42-43 station?
When starting your journey at Sector 42-43, board the train heading towards Phase 3. Platform signage at the station can help confirm the correct direction before boarding.
What is the Sunday metro fare from Sector 42-43 to IP Extension?
The Delhi Metro fare from Sector 42-43 to IP Extension on Sunday is ₹54. Fare discounts, where applicable, are reflected in the displayed amount.
What is the fastest metro route from Sector 42-43 to IP Extension?
The recommended metro route from Sector 42-43 to IP Extension takes around 1 hr 6 min and includes 2 interchange(s). It is designed to provide an efficient journey across the Delhi Metro network.
