Estimated from distance; confirm at the station. Exit within 3 hr of entering. Rapid Metro Line: Fare is an estimate; confirm with the operator.
⇄ Return: Phase 1 to Govind PuriYour journey
Show all 4 stationsHide all 4 stations
Show all 8 stationsHide all 8 stations
First & last metro
| Station | First | Last |
|---|---|---|
| Violet Line Govind Puri Towards Kashmere Gate | 6:36 AM | 11:36 PM |
| Magenta Line Kalkaji Mandir Towards Krishna Park Extension | 6:07 AM | 11:17 PM |
| Yellow Line Hauz Khas Towards Millennium City Centre Gurugram | 6:20 AM | 11:50 PM |
| Rapid Metro Line Sikandarpur Towards Sector 55-56 | 5:41 AM | 11:11 PM |
Times are approximate and can differ on Sundays and holidays. Check the operator for exact timings.
Route map
Metro map

Open full size · Scroll or pinch to zoom, drag to move
Book Metro Tickets Online For Govind Puri to Phase 1
Book DMRC QR Ticket OnlineHow to reach Phase 1 from Govind Puri by metro?
Board the metro at Govind Puri station on the line towards Kashmere Gate and travel through 15 intermediate metro stations. This route needs 3 train changes (3 interchanges at Kalkaji Mandir, Hauz Khas, Sikandarpur); switch trains there to continue to Phase 1.
The approximate travel time between Govind Puri and Phase 1 is 0 hrs 55 mins. The total distance covered on this metro route is 22.8 Km. The first metro from Govind Puri departs at 6:36 AM, while the last train leaves at 11:36 PM.
The estimated metro fare for this route is ₹54. Smart card users may receive discounted fares.
Peak Hour Details
Mon-Fri: 8:00 AM – 12:00 PM and 5:00 PM – 9:00 PMMetro vs cab, auto and bike: fare and time
Estimates for about 26.2 km
| Mode | Est. fare | Est. time |
|---|---|---|
Metro22.8 kmCheapestFastest | ₹54 | 55 min |
Cab / Taxi26.2 km | ₹385–490 | 1 hr 6 min |
Auto-rickshaw26.2 km | ₹310–395 | 1 hr 19 min |
Bike taxi26.2 km | ₹170–220 | 56 min |
💡 Compared with a cab / taxi, the metro saves about ₹384 on this trip.
Road fares are estimates based on typical rates and change with traffic, time of day and app surge pricing. Metro fares follow the fare chart on this site.
FAQs
What is the metro fare from Govind Puri to Phase 1?
The Delhi Metro fare from Govind Puri to Phase 1 is ₹54. Fares are determined by DMRC based on the distance traveled and may be updated from time to time.
How long does it take to travel from Govind Puri to Phase 1 by metro?
The metro journey from Govind Puri to Phase 1 takes approximately 55 min. Including station entry, security checks, and walking inside stations, allow around 1 hr 10 min for the complete trip.
How many stations are there between Govind Puri and Phase 1?
There are 16 stations between Govind Puri and Phase 1 on this route, including any interchange stations if a line change is required.
Do I need to change metro lines to travel from Govind Puri to Phase 1?
This route requires 3 interchange(s). 3 interchanges at Kalkaji Mandir, Hauz Khas, Sikandarpur
Where do I need to change metro lines between Govind Puri and Phase 1?
If a line change is required, passengers should interchange via Kalkaji Mandir, Hauz Khas, Sikandarpur. Follow the signs inside the station to reach the correct platform for the next leg of the journey.
Which metro lines are used on the route from Govind Puri to Phase 1?
The recommended route from Govind Puri to Phase 1 uses the following Delhi Metro line(s): Violet, Magenta, Yellow, Rapid Metro.
What is the distance between Govind Puri and Phase 1?
The metro distance between Govind Puri and Phase 1 is approximately 22.8 km.
Which direction should I take from Govind Puri station?
When starting your journey at Govind Puri, board the train heading towards Kashmere Gate. Platform signage at the station can help confirm the correct direction before boarding.
What is the Sunday metro fare from Govind Puri to Phase 1?
The Delhi Metro fare from Govind Puri to Phase 1 on Sunday is ₹43. Fare discounts, where applicable, are reflected in the displayed amount.
What is the fastest metro route from Govind Puri to Phase 1?
The recommended metro route from Govind Puri to Phase 1 takes around 55 min and includes 3 interchange(s). It is designed to provide an efficient journey across the Delhi Metro network.
