Estimated from distance; confirm at the station. Exit within 3 hr of entering. Rapid Metro Line: Fare is an estimate; confirm with the operator.
⇄ Return: Phase 3 to Mayur Vihar ExtensionYour journey
Show all 5 stationsHide all 5 stations
Show all 11 stationsHide all 11 stations
Show all 4 stationsHide all 4 stations
First & last metro
| Station | First | Last |
|---|---|---|
| Blue Line Mayur Vihar Extension Towards Dwarka Sector 21 | 5:57 AM | 11:27 PM |
| Pink Line Mayur Vihar-I Towards Majlis Park | 6:34 AM | 11:34 PM |
| Yellow Line Dilli Haat INA Towards Millennium City Centre Gurugram | 6:14 AM | 11:44 PM |
| Rapid Metro Line Sikandarpur Towards Phase 3 | 5:41 AM | 11:11 PM |
Times are approximate and can differ on Sundays and holidays. Check the operator for exact timings.
Route map
Metro map

Open full size · Scroll or pinch to zoom, drag to move
Book Metro Tickets Online For Mayur Vihar Extension to Phase 3
Book DMRC QR Ticket OnlineHow to reach Phase 3 from Mayur Vihar Extension by metro?
Board the metro at Mayur Vihar Extension station on the line towards Dwarka Sector 21 and travel through 23 intermediate metro stations. This route needs 3 train changes (3 interchanges at Mayur Vihar-I, Dilli Haat INA, Sikandarpur); switch trains there to continue to Phase 3.
The approximate travel time between Mayur Vihar Extension and Phase 3 is 1 hrs 9 mins. The total distance covered on this metro route is 32.9 Km. The first metro from Mayur Vihar Extension departs at 5:57 AM, while the last train leaves at 11:27 PM.
The estimated metro fare for this route is ₹64. Smart card users may receive discounted fares.
Peak Hour Details
Mon-Fri: 8:00 AM – 12:00 PM and 5:00 PM – 9:00 PMMetro vs cab, auto and bike: fare and time
Estimates for about 37.8 km
| Mode | Est. fare | Est. time |
|---|---|---|
Metro32.9 kmCheapestFastest | ₹64 | 1 hr 9 min |
Cab / Taxi37.8 km | ₹550–700 | 1 hr 35 min |
Auto-rickshaw37.8 km | ₹440–565 | 1 hr 54 min |
Bike taxi37.8 km | ₹245–310 | 1 hr 21 min |
💡 Compared with a cab / taxi, the metro saves about ₹559 on this trip.
Road fares are estimates based on typical rates and change with traffic, time of day and app surge pricing. Metro fares follow the fare chart on this site.
FAQs
What is the metro fare from Mayur Vihar Extension to Phase 3?
The Delhi Metro fare from Mayur Vihar Extension to Phase 3 is ₹64. Fares are determined by DMRC based on the distance traveled and may be updated from time to time.
How long does it take to travel from Mayur Vihar Extension to Phase 3 by metro?
The metro journey from Mayur Vihar Extension to Phase 3 takes approximately 1 hr 9 min. Including station entry, security checks, and walking inside stations, allow around 1 hr 24 min for the complete trip.
How many stations are there between Mayur Vihar Extension and Phase 3?
There are 24 stations between Mayur Vihar Extension and Phase 3 on this route, including any interchange stations if a line change is required.
Do I need to change metro lines to travel from Mayur Vihar Extension to Phase 3?
This route requires 3 interchange(s). 3 interchanges at Mayur Vihar-I, Dilli Haat INA, Sikandarpur
Where do I need to change metro lines between Mayur Vihar Extension and Phase 3?
If a line change is required, passengers should interchange via Mayur Vihar-I, Dilli Haat INA, Sikandarpur. Follow the signs inside the station to reach the correct platform for the next leg of the journey.
Which metro lines are used on the route from Mayur Vihar Extension to Phase 3?
The recommended route from Mayur Vihar Extension to Phase 3 uses the following Delhi Metro line(s): Blue, Pink, Yellow, Rapid Metro.
What is the distance between Mayur Vihar Extension and Phase 3?
The metro distance between Mayur Vihar Extension and Phase 3 is approximately 32.9 km.
Which direction should I take from Mayur Vihar Extension station?
When starting your journey at Mayur Vihar Extension, board the train heading towards Dwarka Sector 21. Platform signage at the station can help confirm the correct direction before boarding.
What is the Sunday metro fare from Mayur Vihar Extension to Phase 3?
The Delhi Metro fare from Mayur Vihar Extension to Phase 3 on Sunday is ₹54. Fare discounts, where applicable, are reflected in the displayed amount.
What is the fastest metro route from Mayur Vihar Extension to Phase 3?
The recommended metro route from Mayur Vihar Extension to Phase 3 takes around 1 hr 9 min and includes 3 interchange(s). It is designed to provide an efficient journey across the Delhi Metro network.
